Pembuatan saluran

in #aceh9 years ago

imagethis is a photo of the location of the project that the channel will be constructed by looking at the existing plan on the planned drawing, then it will be pegged, so in this case it needs the cooperation of the local village official or called the geuchik pack and his device with the supervisory consultant and partner before the work is done

Coin Marketplace

STEEM 0.06
TRX 0.32
JST 0.064
BTC 66179.50
ETH 2031.60
USDT 1.00
SBD 0.47