THE DISCOS PROJECT.

in #bsc5 years ago

11-48-14-E7CfJa2XEAEilCT.jpg

A COMMUNITY CONTROLLED INNOVATION

Built on the Binance Smart Chain, Discos Token is a community token – created for fun and more especially for discussion, entertainment, and gamingpurpose.

Why DISCOS?
Because everyone deserves the right to be happy, the right to contribute and share opinion in the community they belong, every DISCOS Token holder will have the right in MAKING DECISIONS which will be based on the number of tokens a user holds.

11-48-42-e4ac4f12fa3e06e1bbf86.png

WHAT IS DISCOS TOKEN
Built on the Binance Smart Chain, Discos Token is a community controlled innovation token - created for fun and more especially for discussion, gaming, and entertainment purpose. As a community token, no one controls its activities. In other words, there will be no central authority or team. Everyone will have to work to earn discos token. The community decides what they want of the project after the whole tokens have been distributed to users. Every user will have the right in making decision which will be based on the number of tokens a user holds.

T O K E N C R E A T I O N A N D P R I C I N G
TOKEN DETAILS

The total tokens created are

● 1 Trillion (1,000,000,000,000)

● Contract Address: 0x812E3562A17f2A6cF68598DfB8AE529084Ec6A29

● Token Name: DISCOS

● Symbol: DST

● Decimals: 18

TOKEN PRICING
While we may not have control over DST Token price after the funding event, during the event, the price of Discos Token will be fixed at $0.00001 While in the Pre-funding event, it will be 0.0000075 - tied to Binance Coin (BNB) with BNB fixed at $300.

● 1BNB - 30,000,000 DST

(fixed price for the funding event)

● 1BNB - 40,000,000 DST

(fixed price during Pre-Funding event)

T O K E N A L L O C A T I O N
The entire token will be divided into:

65% will be for funding. While the other

35% will be for Airdrop and bounty hunting The airdrop will be done in various stages. And for the sales, all unsold tokens will be burnt.

11-48-47-bd7c897bd473843a89da7.png

  1. Funding = 65%

(all unsold tokens will be burnt)

  1. Airdrop and bounty = 35%

(Will be done in different stages)

F U N D A L L O C A T I O N

11-48-50-e8efd60b8838b9105d069.png

● Ma r k e ti n g = 5 0%

● B u y - b a c k = 2 5 %

● Exchange listing = 25%

FUNDING EVENT
● Minimum Contribution – 0.1BNB

● Maximum Contribution – 50BNB

● Pre-Funding Token Price – 1BNB = 40,000,000 DST

● Main Funding Event Price – 1BNB = 30,000,000 DST

A I R D R O P P I N G & B O U N T Y
The tokens will be airdropped in different stages as follows:

Stage 1: 70 Billion Tokens will allocated for the both airdrop and Bounty. And in every 3 months, there will be Bounty and Airdrop with certain requirements, which will be communicated.

At the first stage, each user will receive 200 Thousand Discos token and 20 thousand tokens for each referral. To get the 200 thousand token, you must be referred by an existing user, otherwise, such user will only receive 100,000 tokens.

The maximum number of token a user can get in this first stage is 5,000,000 Discos token.

AIRDROP & BOUNTY PLANS
● Total Airdrop Tokens = 350,000,000,000 (in Stages)

● Stage 1 = 70,000,000,000 divided into:

● Bounty: 30,000,000,000

● Airdrop: 40,000,000,000

ROAD MAP 2 0 2 1

11-48-55-DISCOS-PROJECT-ROADMAP-1024x662.png

For more details, please visit the link below:
● Official Website: https://discosproject.site/

● Telegram Channel: https://t.me/discosproject

● WHITEPAPER: https://discosproject.site/wp-content/uploads/2021/07/DISCOS-PROJECT-WHITEPAPER.pdf

● Discord: https://discord.gg/CdDyzBGuMQ

● Twitter: https://twitter.com/discosproject

AUTHOR

Bitcointalk Username: Mairacute

Telegram Username: @mairacute

Bitcointalk url: https://bitcointalk.org/index.php?action=profile;u=3334914

BSC USDT Wallet Address : 0x9758aabf2b323516C272e1B676131703790f87A7

Coin Marketplace

STEEM 0.06
TRX 0.31
JST 0.064
BTC 68240.24
ETH 2087.29
USDT 1.00
SBD 0.47