World Smile Project : Construction of Free Education Center

The percentage of completion of the construction of the free education center this time experienced a very significant increase starting from November 4 to today, where today after conducting a construction engineering analysis it has reached 80% of the total. I can say this because the construction of this free education center only leaves 4 items out of 12 main work items.

The 4 items that are being and will be carried out in the past few days are the installation of electrical installations which have reached 70%, where the rest is the installation of lights and mains electricity, this installation will be considered 100% when the ceiling work is also completed.

From the results of the construction engineering analysis and when taken into account with the constraints in the construction site of the free education center, it is targeted to be completed no later than the end of November, this refers to 3 main work items that will soon be carried out, namely the installation of ceilings along with the installation of lights and currents. main power. While the stairs will be done simultaneously with painting which is the finishing of this development.

Below I also attach in a table form about the 12 main jobs that have been, are being and have been completed by the workers with the code Complete which means it has been completed perfectly, Almost Complete which means being done and almost finished, and On Progress is the work to be done in the near future and the material inventory is already on site.

Apart from the table I explained, I also attach photos of the progress achieved as of today for the public to consume for the sake of transparency of the World Smile Project program.

Table of the main types of work from the construction of the Free Education Center
NumberType of workNotes
1Pole or ColumnComplete
2Lower BeamComplete
3Floor AdhesiveComplete
4FloorComplete
5WallComplete
6Top BeamComplete
7TrestleComplete
8RoofComplete
9StairsOn Progress
10CeilingOn Progress
11Electrical installationAlmost Complete
12PaintingOn Progress
Design of the Free Education Center Construction

Progress of Free Education Center Development As of November 09, 2021
PerspectivePresent Condiition
Front View20211109_134724-01.jpeg
Front and Right View20211109_134635-01.jpeg
Right View20211109_134655-01.jpeg
Front and Left View20211109_134814-01.jpeg
Left View20211109_134833-01.jpeg
Related conditions other than the appearance of the development
20211109_134930.jpg20211109_134909.jpg
Inside ViewInside View
20211109_135052.jpg20211109_135033.jpg
Electrical InstallationElectrical Installation
20211109_135015.jpg20211109_134953.jpg
Electrical InstallationElectrical Installation
MAIN INFORMATION FROM WORLD SMILE PROJECT
Project NameFree Education Center
BeneficiaryKhairul Huda School Boarding
AddressSyamtalira Aron, North Aceh - Indonesia

Related Links


Note:


  • Construction progress updates will be presented for budget transparency
  • Completely update budget expenditure can be seen in @miftahuddin's post (Free Education Center)
  • Total Budget Revenue and Expenditure from the World Smile Project is handled by @heriadi and @irawandedy
  • All documents have been authorized by the relevant parties
  • Documents in the form of photos or writing must have permission from World Smile Project team

Cc : @steemcurator01 @steemcurator02 @pennsif @el-nailul @mariana4ve

Thanks
@klen.civil


cropped_image (1).png

Sort:  
 2 years ago 

Free Education Center project

I really like this project of yours. It will work well for the education of neglected children. I want to help you with the projector.

People continue to do this for the people, I will always be by your side inshallah.

 2 years ago 

Insha Allah

It is good to know that people like you support these projects that so much need these works for their education, best regards.

Very good initiative for free education, which is the most eloquent for children to have quality education wherever it is.

 2 years ago 

Hampir 90% selesai ya bg, untuk proses loteng kiban bg nyan?

 2 years ago 

Dalam proses pemesanan
Mungkin meu padum uroe teuk katrok.

 2 years ago 

Oh get that bg,loteng pu rencana ne pasang bg?

 2 years ago 

PVC kamo neuk pasang

 2 years ago 

Keren that entek bale nyan bg 👍👍

 2 years ago 

Terima kasih

 2 years ago 

Keren bg, setelah pembangunan rampung 100% bisa dilanjutkan kegiatan amal selanjutnya.
Muantap

#club5050
#worldsmileproject50pc

 2 years ago 

Aamiin

 2 years ago 

Beautiful plan to undertake such a beautiful project. Thank you and best wishes to all the community admins and moderators.

 2 years ago 

Thanks a lot

 2 years ago 

It's a very good initiative❣️

 2 years ago 

Thanks a lot

 2 years ago 

Pajan peresmian nyan...?😁

 2 years ago 

Tapreh siap ile bg
hehehe

 2 years ago 

Mantap.....👍

 2 years ago 

👌

 2 years ago (edited)

Wah udah hampir selesai juga ya balai nya 🤗. Mantap Two thumb up for all team work. Ganbatte 💪💪

 2 years ago 

Terima kasih kakak

 2 years ago 

With my pleasure adoe 🤗

 2 years ago 

😊😇

#club5050 😀 😀

 2 years ago 

Thanks a lot

#club5050

 2 years ago 

Hermoso felicitaciones, bendiciones para todos.

 2 years ago 

Thanks a lot

Coin Marketplace

STEEM 0.30
TRX 0.12
JST 0.032
BTC 62705.03
ETH 3101.95
USDT 1.00
SBD 3.82