Docks for a Kids summer camp
They came to me with a problem, they needed 5 dock made in 5 days. Their gut said it would take a month...But I did it for the kids 😅 and the money 😅
Started out by getting all the framework done.
Then attacked the floats to the bottom.
once I had a few in the water I could begin decking them (would have been too heavy to move)
Then to configure the design, finalize it with the dock master and add the toe rail.
Another satisfied customer 😎