Photography during house construction

in #photo8 days ago

1000062983.jpg

1000062985.jpg

1000062982.jpg

1000062984.jpg

Inside a room, wiring has been done using pipes. First, the room was built with bricks, and then the inside was left hollow to install the pipes. The pipes are being placed nicely. After installing these pipes, cement will be applied over them, and then the wiring will be completed. It seems that this is how it is done: first the pipes are installed, and then cement is applied over them to make the design look neat and beautiful.

This is how the work is being done, and it has turned out quite well. Today, when this work was being done, I went there to see it. After seeing it, I felt very good, and then I took some pictures of the room, which I am now sharing with you.

Sort:  
Loading...

Upvoted! Thank you for supporting witness @jswit.

Coin Marketplace

STEEM 0.06
TRX 0.28
JST 0.048
BTC 72560.71
ETH 2128.96
USDT 1.00
SBD 0.50