Mirpur 10 Metro Station,

in Steem For Lifestyle24 days ago

Hello Everyone
This is @sushanta83 From #Bangladesh

Hello friends, how are you? I hope you are doing well.Today I am back with a new post for you.Here is @solaymann They organized a good competition. Of course I participated in the competition.Steemit Challenge Season 28 Week3 - Transport station

Mirpur 10 Metro Station was opened for service on 1 March 2030. It was constructed under Package CP 04. The notice of application for construction of elevated bridge for station and railway was published on 30 June 2015. The contract for the work under this package was awarded to Italian Thai Development Public Company Limited. The matter was referred to the Ministry of Parliamentary Affairs on 19 March 2017 for investigation. The construction work of the station was completed by December 2021.

Mirpur 10 Metro Station
Opposite Elevator

I have already come from Mirpur number 1 to Mirpur number 10 by bus, that is, to Mirpur 10 Metro Station. First, when I came in front of the station, I stood and noticed that there were stairs on the left side and an elevator on the right side. So in a while, I saw several people walking up the stairs. I also noticed that the elevator was completely empty, so I immediately entered and came to a 2-story building. Of course, I have to review every activity from the second floor building.

Tickets
Platform text on the monitor

I soon noticed that a very beautiful banner had been made above where I could easily see which side the ticket counter was located. So I immediately understood by looking at the sign that the ticket counter was located on the opposite side. Of course, I had to collect the tickets myself here. Then I noticed on the wall that the names and times of different platforms were being shown through monitors. Anyone can review them anywhere very easily.

Ticket counter
Single Journey tricket
Entrance

Then I noticed that there are three to four machines here where you can easily collect tickets online by paying money. So here I noticed that everyone was busy standing in line to collect tickets. I was also standing in line on the other side to collect tickets. In the meantime, I captured a few pictures where some people were busy buying tickets. Anyway, within a while I purchased a ticket for Farmgate from Mirpur 10. Of course, I had to pay 30 taka for a single journey. Then with that ticket in hand, I started walking forward, made a payment through the machine and came inside.

Platform path
Taking the ticket in hand

After a while, I noticed that there is a room on the other side. Where you can easily pay money from this room without having to pay online and get a ticket. A person is always sitting here to sell tickets. Especially those who cannot collect tickets through the machine can certainly collect tickets from this room very easily. I saw the platform room so I immediately walked up to the three-story building. Where the metro rail is standing for me and the passageway.

The metro is standing still
Banner
Route map

As soon as I got up, I noticed that within about a minute, the metro rail had reached counter number 10. The metro would stop here for about two to five seconds. Then it would depart for its destination. Immediately, I noticed that there were banners of different places. Banners of different educational institutions and different banks. Then I noticed that on one side, a very beautiful and clearly visible map of the journey route was drawn. Where you can easily review which way you are going. Anyway, I entered the metro rail very quickly.

Inside view of the metro

As soon as I entered inside, I noticed that there was a crowd of people. Because it is possible to reach the destination very easily with this metro rail, no kind of jam can catch us. There is a lot of jam in Dhaka city, that is why traveling by metro rail is very enjoyable and takes less time. However, inside, a situation has arisen where I was standing inside and going towards the destination. I must have reviewed a scene inside with you.

Display
Top railing

In about 20 minutes I reached my destination, i.e. Farmgate station. Within a short while I got out of the metro and stood outside. Here I noticed that the destination and time were mentioned through the display. Because one metro train started coming every now and then. Anyway, I really liked the views inside. The view from above is very beautiful and there is enough electric lights and sunlight inside.

Exterior and CCTV cameras

Of course I am inside the platform. So in a while I have to leave this platform so immediately I saw the exit banner that I have to go down through this path i.e. exit. Here I noticed that CCTV and electric fan were running. So in a while I got out of the platform and came out of Farmgate Metrorail station.

YouTube channel 🔗

Inviting my Steemian friend @issambashir @max-pro @ariful2 @zulbahri @sohag10

PlaceMirpur 10 Metro Station, Mirpur
Photographer@sushanta83
Google map Locationclick link
AddressR959+974, Dhaka 1216
Plus codes7MMGR959+87
Atlas pin code[//]:# (!steematlas 23.8083125 lat 90.3681875 long Mirpur 10 Metro Station d3scr)
Contact01316-146222
photoNarzo50 mobile

Thank you very much for reading my Blog♥️

Posted using SteemMobile

Sort:  
 24 days ago 

ঠিকই আছে, সমস্যানাই✅

 24 days ago 

আসেন মেট্রো এর ভেতরে বসে চা খাই, চলে আসেন🤤😁

 24 days ago 

মেট্রোর ভেতর কোন প্রকার খাবার নেওয়া নিষেধ ❌

 24 days ago 

তারজন্যই তো বললাম চা খামু 😃

 24 days ago 

আপনি ট্রাভেল করতে গেছেন আপনার সেলফি কই যে প্রান্তে ভ্রমণ করেন ছবির প্রয়োজন পোস্ট এর ভিতর। আপনাকে ধন্যবাদ আপনার এই ট্রাভেলটি সুন্দরভাবে আমাদের মাঝে উপস্থাপন করছেন।

 24 days ago 

মন্তব্য প্রদান করার জন্য আপনাকে অসংখ্য ধন্যবাদ,

Loading...